Documenting Palestinian architectural heritage at risk

This 12-month plan safeguards the record of 22 places across 4 regional projects—documenting what survives, connecting it to community memory, and opening the resulting archive to research, learning and public life.

22
locations in scope20 confirmed · 2 provisional
4
regional projectsselected for this plan
12
monthsselected delivery period

If we lose our architectural heritage, we will lose our identity.

Every surviving house, mosque, church and mill holds evidence of a place: how it was built, how people lived there, and how memory endures in its landscape. OpenVL brings spatial documentation, photographs, maps, archival sources and community knowledge together so this record can be studied, shared and carried forward.

Document
Record priority places through field photography, spatial capture, measured documentation and source research before more evidence is lost.
Connect
Bring point clouds, virtual tours, 3D models, maps, photographs, archival sources and community memory into a coherent digital record.
Share
Make the archive useful to communities, researchers, educators, artists and cultural institutions—and carry the record forward.

Year 2 · Expansion and completion

This selected plan funds 12 months of delivery across Haifa, Tiberias, Acre and Jenin / Jarrar heritage cluster. It brings together the team, tools, archive operations and project work required for an accountable delivery phase.

Support this selected plan as a lead funder or project partner. Funding commitments can be phased against agreed deliverables.

All amounts in USD · Selected view total. Choose Year 1 or Year 2 above for a true annual plan, or Whole program for the complete 24 months. The monthly and annualized controls show comparison rates only.

Selected funding package

Funding request $311,762.11

Funding required for the selected delivery package across 12 months.

CategorySelected delivery cost before contingency
Core delivery team$92,426.17
Archive, entity and recurring operations$15,334.80
Field documentation and 3D scanning$43,902.45
Forensic research and reconstruction$116,352.29
Exhibition and distribution$15,404.38
Contingency$28,342.02
Selected delivery costs$311,762.11

Projects and delivery

Each province or regional area is one project. Forensic work is priced by selected village: one two-person team-month plus sources and tools for each village. One whole-deliverable finalization budget covers template design, curation and narrative assembly, integration, language and content QA, delivery, and one sample print per area; it is charged once and allocated among the active forensic areas.

Regional projectIncluded locationsSelected scopeSelected delivery cost
Haifa province
قضاء حيفا
Haifa province (قضاء حيفا) — 8 agreed fieldwork locations: Atlit (عثليث); Ayn Hawd (عين حوض); Sarafand (صرفند); Caesarea (قيسارية); Kafr Lam (كفر لام); Ijzim (إجزم); al-Tantura (الطنطورة); Qira and Qamun (قيرة وقامون).Haifa province — field documentation and 3D scanning
Haifa province — forensic research and reconstruction
$57,616.88
Tiberias province
قضاء طبريا
Tiberias province (قضاء طبريا) — 5 agreed fieldwork locations: Tiberias (طبريا); Lubya (لوبيا); al-Shajara (الشجرة); Hittin (حطين); Samakh (سمخ).Tiberias province — field documentation and 3D scanning
Tiberias province — forensic research and reconstruction
$36,553.04
Acre province
قضاء عكا
Acre province (قضاء عكا) — 7 agreed fieldwork locations: Deir al-Qassi (دير القاسي); al-Ghabisiyya (الغابسية); Suhmata (سحماتا); Tarbikha (تربيخا); Iqrit (إقرت); al-Bassa (البصة); al-Damun (الدامون).Acre province — field documentation and 3D scanning
Acre province — forensic research and reconstruction
$50,595.58
Jenin / Jarrar heritage cluster
جنين ومجموعة مواقع جرّار التراثية
Jenin / Jarrar regional heritage cluster (جنين ومجموعة مواقع جرّار التراثية). Confirmed anchors in the current research: Jarrar / al-Khokha Palace in Burqin (قصر جرّار / الخوخة، برقين); Sanur Citadel (قلعة صانور). The complete constituent-site list remains to be confirmed before the five-day placeholder is allocated.Jenin / Jarrar cluster — field documentation and 3D scanning
Jenin / Jarrar cluster — forensic research and reconstruction
$15,489.24

Category sums show selected costs before contingency. Open a group to review its modules and cost items. Detailed deliverables and acceptance criteria will be agreed before commitments.

Core delivery team $92,426.17

Monthly average: $7,702.18 · 2 modules selected

Adam — program architecture, data systems, digital infrastructure and delivery · $46,213.09 · confirmed

Architects the operating system for the program: planning, data governance, digital infrastructure, web platforms, delivery controls, and the technical integration that turns research into a durable public archive.

Monthly average: $3,851.09.

Cost itemBasisUSD · selected periodMonthly average
Adam Gera1 / monthly$46,213.09$3,851.09
Karim — curatorial direction, 3D capture, reconstruction, post-production and partnerships · $46,213.08 · confirmed

Leads the interpretive and spatial production layer: curatorial judgment, 3D capture and reconstruction, post-production, evidence selection, and the relationships that make each project credible and usable.

Monthly average: $3,851.09.

Cost itemBasisUSD · selected periodMonthly average
Karim Yehia1 / monthly$46,213.08$3,851.09
Archive, entity and recurring operations $15,334.80

Monthly average: $1,277.90 · 5 modules selected

Matterport archive hosting · $2,952.50 · estimate

Monthly average: $246.04.

Cost itemBasisUSD · selected periodMonthly average
Matterport1 / annual$2,952.50$246.04
Nira point-cloud hosting · $3,851.09 · estimate

Monthly average: $320.92.

Cost itemBasisUSD · selected periodMonthly average
Nira / point-cloud hosting1 / annual$3,851.09$320.92
Cloud storage and backups · $1,283.70 · estimate

Monthly average: $106.98.

Cost itemBasisUSD · selected periodMonthly average
Cloud storage + backup1 / annual$1,283.70$106.98
Vehicle, fuel and local transport · $5,507.06 · estimate

Monthly average: $458.92.

Cost itemBasisUSD · selected periodMonthly average
Vehicle, fuel and local field transport28.6 / daily$5,507.06$458.92
UK Ltd — year 2 compliance · $1,740.45 · provisional

Monthly average: $145.04.

Cost itemBasisUSD · selected periodMonthly average
UK Ltd — year 2 compliance1 / per project$1,740.45$145.04
Field documentation and 3D scanning $43,902.45

Monthly average: $3,658.54 · 4 modules selected

Haifa province — field documentation and 3D scanning · $15,789.48 · estimate

Eight recorded locations, each budgeted for one field-documentation day and one post-processing day, plus one $300 regional travel allowance.

Province and included villages: Haifa province (قضاء حيفا) — 8 agreed fieldwork locations: Atlit (عثليث); Ayn Hawd (عين حوض); Sarafand (صرفند); Caesarea (قيسارية); Kafr Lam (كفر لام); Ijzim (إجزم); al-Tantura (الطنطورة); Qira and Qamun (قيرة وقامون).

8 of 8 documentation villages selected: Atlit (عثليث); Ayn Hawd (عين حوض); Sarafand (صرفند); Caesarea (قيسارية); Kafr Lam (كفر لام); Ijzim (إجزم); al-Tantura (الطنطورة); Qira and Qamun (قيرة وقامون).

Monthly average: $1,315.79.

Cost itemBasisUSD · selected periodMonthly average
3D field documentation — Haifa province8 / daily$10,269.58$855.80
Post-processing — Haifa province8 / daily$5,134.79$427.90
Regional travel — Haifa province1 / per project$385.11$32.09
Tiberias province — field documentation and 3D scanning · $10,012.84 · estimate

Five recorded locations, each budgeted for one field-documentation day and one post-processing day, plus one $300 regional travel allowance.

Province and included villages: Tiberias province (قضاء طبريا) — 5 agreed fieldwork locations: Tiberias (طبريا); Lubya (لوبيا); al-Shajara (الشجرة); Hittin (حطين); Samakh (سمخ).

5 of 5 documentation villages selected: Tiberias (طبريا); Lubya (لوبيا); al-Shajara (الشجرة); Hittin (حطين); Samakh (سمخ).

Monthly average: $834.40.

Cost itemBasisUSD · selected periodMonthly average
3D field documentation — Tiberias province5 / daily$6,418.49$534.87
Post-processing — Tiberias province5 / daily$3,209.24$267.44
Regional travel — Tiberias province1 / per project$385.11$32.09
Acre province — field documentation and 3D scanning · $13,863.93 · estimate

Seven recorded locations, each budgeted for one field-documentation day and one post-processing day, plus one $300 regional travel allowance.

Province and included villages: Acre province (قضاء عكا) — 7 agreed fieldwork locations: Deir al-Qassi (دير القاسي); al-Ghabisiyya (الغابسية); Suhmata (سحماتا); Tarbikha (تربيخا); Iqrit (إقرت); al-Bassa (البصة); al-Damun (الدامون).

7 of 7 documentation villages selected: Deir al-Qassi (دير القاسي); al-Ghabisiyya (الغابسية); Suhmata (سحماتا); Tarbikha (تربيخا); Iqrit (إقرت); al-Bassa (البصة); al-Damun (الدامون).

Monthly average: $1,155.33.

Cost itemBasisUSD · selected periodMonthly average
3D field documentation — Acre province7 / daily$8,985.88$748.82
Post-processing — Acre province7 / daily$4,492.94$374.41
Regional travel — Acre province1 / per project$385.11$32.09
Jenin / Jarrar cluster — field documentation and 3D scanning · $4,236.20 · estimate

Two currently recorded Jenin / Jarrar locations, each budgeted for one field-documentation day and one post-processing day, plus one $300 regional travel allowance. The wider cluster scope remains provisional pending the complete site list.

Province and included villages: Jenin / Jarrar regional heritage cluster (جنين ومجموعة مواقع جرّار التراثية). Confirmed anchors in the current research: Jarrar / al-Khokha Palace in Burqin (قصر جرّار / الخوخة، برقين); Sanur Citadel (قلعة صانور). The complete constituent-site list remains to be confirmed before the five-day placeholder is allocated.

2 of 2 documentation villages selected: Jarrar / al-Khokha Palace in Burqin (قصر جرّار / الخوخة، برقين); Sanur Citadel (قلعة صانور).

Monthly average: $353.02.

Cost itemBasisUSD · selected periodMonthly average
3D field documentation — Jenin / Jarrar cluster2 / daily$2,567.39$213.95
Regional travel — Jenin / Jarrar cluster1 / per project$385.11$32.09
Post-processing — Jenin / Jarrar cluster2 / daily$1,283.70$106.98
Forensic research and reconstruction $116,352.29

Monthly average: $9,696.02 · 4 modules selected

Haifa province — forensic research and reconstruction · $41,827.40 · estimate

Village-based forensic research and reconstruction. Village research and sources scale by selection. Curation, narrative direction, integration, final QA and digital delivery form one common production pass, charged once across the selected scope and allocated equally to its active areas. One physical sample book is budgeted per area; exhibition curation is separate.

Province and included villages: Haifa province (قضاء حيفا) — 8 agreed fieldwork locations: Atlit (عثليث); Ayn Hawd (عين حوض); Sarafand (صرفند); Caesarea (قيسارية); Kafr Lam (كفر لام); Ijzim (إجزم); al-Tantura (الطنطورة); Qira and Qamun (قيرة وقامون).

8 of 8 villages selected: Atlit (عثليث); Ayn Hawd (عين حوض); Sarafand (صرفند); Caesarea (قيسارية); Kafr Lam (كفر لام); Ijzim (إجزم); al-Tantura (الطنطورة); Qira and Qamun (قيرة وقامون).

ComponentBasisUSD · selected periodMonthly average
Two-person research and design teamPer selected village · one team-month$33,971.48$2,830.96
Sources and specialist toolsPer selected village$6,794.30$566.19
Whole-deliverable finalizationAllocated across 4 active areas · includes one sample print per area$1,061.62$88.47
Tiberias province — forensic research and reconstruction · $26,540.20 · estimate

Village-based forensic research and reconstruction. Village research and sources scale by selection. Curation, narrative direction, integration, final QA and digital delivery form one common production pass, charged once across the selected scope and allocated equally to its active areas. One physical sample book is budgeted per area; exhibition curation is separate.

Province and included villages: Tiberias province (قضاء طبريا) — 5 agreed fieldwork locations: Tiberias (طبريا); Lubya (لوبيا); al-Shajara (الشجرة); Hittin (حطين); Samakh (سمخ).

5 of 5 villages selected: Tiberias (طبريا); Lubya (لوبيا); al-Shajara (الشجرة); Hittin (حطين); Samakh (سمخ).

ComponentBasisUSD · selected periodMonthly average
Two-person research and design teamPer selected village · one team-month$21,232.17$1,769.35
Sources and specialist toolsPer selected village$4,246.43$353.87
Whole-deliverable finalizationAllocated across 4 active areas · includes one sample print per area$1,061.60$88.47
Acre province — forensic research and reconstruction · $36,731.65 · estimate

Village-based forensic research and reconstruction. Village research and sources scale by selection. Curation, narrative direction, integration, final QA and digital delivery form one common production pass, charged once across the selected scope and allocated equally to its active areas. One physical sample book is budgeted per area; exhibition curation is separate.

Province and included villages: Acre province (قضاء عكا) — 7 agreed fieldwork locations: Deir al-Qassi (دير القاسي); al-Ghabisiyya (الغابسية); Suhmata (سحماتا); Tarbikha (تربيخا); Iqrit (إقرت); al-Bassa (البصة); al-Damun (الدامون).

7 of 7 villages selected: Deir al-Qassi (دير القاسي); al-Ghabisiyya (الغابسية); Suhmata (سحماتا); Tarbikha (تربيخا); Iqrit (إقرت); al-Bassa (البصة); al-Damun (الدامون).

ComponentBasisUSD · selected periodMonthly average
Two-person research and design teamPer selected village · one team-month$29,725.04$2,477.09
Sources and specialist toolsPer selected village$5,945.01$495.42
Whole-deliverable finalizationAllocated across 4 active areas · includes one sample print per area$1,061.60$88.47
Jenin / Jarrar cluster — forensic research and reconstruction · $11,253.04 · provisional

Village-based forensic research and reconstruction. Village research and sources scale by selection. Curation, narrative direction, integration, final QA and digital delivery form one common production pass, charged once across the selected scope and allocated equally to its active areas. One physical sample book is budgeted per area; exhibition curation is separate.

Province and included villages: Jenin / Jarrar regional heritage cluster (جنين ومجموعة مواقع جرّار التراثية). Confirmed anchors in the current research: Jarrar / al-Khokha Palace in Burqin (قصر جرّار / الخوخة، برقين); Sanur Citadel (قلعة صانور). The complete constituent-site list remains to be confirmed before the five-day placeholder is allocated.

2 of 2 villages selected: Jarrar / al-Khokha Palace in Burqin (قصر جرّار / الخوخة، برقين); Sanur Citadel (قلعة صانور).

ComponentBasisUSD · selected periodMonthly average
Two-person research and design teamPer selected village · one team-month$8,492.86$707.74
Sources and specialist toolsPer selected village$1,698.58$141.55
Whole-deliverable finalizationAllocated across 4 active areas · includes one sample print per area$1,061.60$88.47
Exhibition and distribution $15,404.38

Monthly average: $1,283.70 · 1 modules selected

OpenVL touring exhibition — production and distribution · $15,404.38 · estimate

One compact, reusable exhibition based on the demonstrated Visualising Saffuriya installation: printed archival panels, a physical model, simple display furniture and basic media playback. The $12,000 production estimate includes exhibition-specific preparation, fabrication, packing, test installation and distribution materials. Core research and team capacity are budgeted elsewhere. Future venue-specific freight, customs, insurance, venue hire, staff travel and local installation are added only when a host is confirmed.

Monthly average: $1,283.70.

Cost itemBasisUSD · selected periodMonthly average
Exhibition producing and project management1 / one time$1,026.96$85.58
Curatorial and interpretive development1 / one time$898.59$74.88
Spatial, graphic and technical design1 / one time$1,540.44$128.37
Media post-production, rights and translation1 / one time$770.22$64.19
Modular fabrication, graphics and display furniture1 / one time$4,107.83$342.32
AV hardware, interactivity, cabling and spares1 / one time$1,540.44$128.37
Reusable travel cases, packing and condition documentation1 / one time$1,540.44$128.37
Prototype, first installation, testing and installation manual1 / one time$2,310.65$192.55
Launch, education, communications and distribution kit1 / one time$1,668.81$139.07
Budget assumptions
Delivery contingency
10% when enabled

The selected category, project and cost-item amounts reconcile directly to the total funding request.

Selected references